Automating Interconnection Queue Screening with Async Proximity Scoring

Screening a portfolio of candidate generation sites against the grid is a pipeline, not a single distance call. You start with hundreds or thousands of parcels, you need the interconnection distance to the nearest viable point of the network for each, and you need the answer ranked by feasibility so a development team can decide what to submit into the queue. The naive version — loop each site, await a routing request, collect the results — is the exact pattern this page exists to fix. It compounds the pairwise proximity-scaling problem covered by the parent workflow with a second failure surface: an async client that either serializes into an unusable wall-clock time or, worse, fires every request at once and takes the routing endpoint (and your local socket pool) down with it.

The fix is a staged pipeline. Normalize and project every input, prescreen with a cheap straight-line nearest-feature query so the expensive router only ever sees the legs that genuinely need it, resolve that obstructed subset with a bounded, retrying, order-preserving async client, merge in capacity headroom, and emit a ranked table with the provenance a reviewer can re-run. Straight-line distance is the prescreen; a routed distance combined with thermal headroom is the verdict.

Where the Screening Pipeline Fails

The scenario that breaks production is a screening script that mixes CPU-bound geopandas work and network-bound routing inside one asyncio event loop, then dispatches with an unbounded asyncio.gather. It passes on twenty test sites and falls over on a real 8,000-site portfolio. The symptoms are a cascade of aiohttp.ClientOSError: [Errno 24] Too many open files, TimeoutError, or a hung run that never returns — and if it does return, a feasibility table whose distances are silently misaligned to the wrong sites.

Root-Cause Analysis

Four compounding causes turn a working demo into a broken batch, and each maps to a distinct stage of the fix below.

  1. Unbounded asyncio.gather exhausts sockets and the endpoint. gather(*[fetch(s) for s in sites]) schedules every coroutine immediately. Eight thousand concurrent POSTs open eight thousand connections, blow past the process file-descriptor limit, and hammer the routing service into rate-limiting or refusing you. Concurrency must be bounded, not merely parallel.
  2. No per-request timeout or retry. A single slow or dropped routing response with no ClientTimeout blocks its slot indefinitely, and one transient 503 with no retry propagates a hard exception up through gather that aborts the whole run. Tail latency on one leg should never stall or fail the portfolio.
  3. Blocking geopandas work inside the event loop. Calling sjoin_nearest, to_crs, or a buffer directly in an async def freezes the loop: while NumPy/GEOS holds the thread, no pending routing response can be awaited. The CPU-bound spatial work has to run before the loop, or be pushed to an executor.
  4. Ordering scrambled on gather. asyncio.gather preserves the order of the tasks you pass it, but the moment you build tasks from a filtered subset, sort mid-stream, or key results by completion order, routed distances land against the wrong site_id. The join back to the portfolio must be by explicit key, never by position.
Async queue-screening failure causes mapped to their fixes Left column lists four failure causes as warning nodes: unbounded gather exhausting sockets, no timeout or retry, blocking geopandas in the event loop, and scrambled result ordering. Each maps rightward to a neutral fix node: Semaphore-bounded dispatch, per-request ClientTimeout with bounded retry backoff, spatial prescreen run before the loop with CPU work offloaded to an executor, and results keyed by site_id joined back by key. All four fixes feed a single success node: a ranked, order-safe feasibility table. FAILURE CAUSE FIX STAGE Unbounded gatherexhausts sockets / endpoint No per-requesttimeout or retry Blocking geopandasinside the event loop Scrambled resultordering Semaphore-boundeddispatch ClientTimeout +bounded retry backoff Prescreen before loop;CPU work to executor Key by site_id,join back by key Ranked,order-safefeasibility table

Pre-Flight Validation

Before a single routing call is made, confirm the portfolio and the grid layer are screenable. A projected, meter-based frame is non-negotiable for distance work — enforce coordinate reference system alignment up front so the straight-line prescreen and the routed distances share one metric. The validator surfaces the disqualifying condition with a precise message instead of letting it corrupt the ranking silently.

python
import geopandas as gpd


def preflight_screen_inputs(
    sites_gdf: gpd.GeoDataFrame,
    grid_gdf: gpd.GeoDataFrame,
    target_epsg: int = 32610,
) -> None:
    """Fail fast on the conditions that would corrupt a queue screen."""
    for name, gdf in (("sites", sites_gdf), ("grid", grid_gdf)):
        if gdf.crs is None:
            raise ValueError(f"{name} layer has no CRS; distances undefined.")
        if gdf.crs.is_geographic:
            raise ValueError(
                f"{name} layer is geographic ({gdf.crs.to_epsg()}); reproject "
                f"to a projected metre frame such as EPSG:{target_epsg}."
            )
        if gdf.crs.to_epsg() != target_epsg:
            raise ValueError(
                f"{name} CRS EPSG:{gdf.crs.to_epsg()} != target EPSG:{target_epsg}."
            )
    missing = {"site_id"} - set(sites_gdf.columns)
    if missing:
        raise ValueError(f"sites layer missing required columns: {missing}")
    if "available_capacity_mw" not in grid_gdf.columns:
        raise ValueError("grid layer missing 'available_capacity_mw' for headroom merge.")
    if not sites_gdf["site_id"].is_unique:
        raise ValueError("site_id is not unique; the routed-distance join would be ambiguous.")

The site_id uniqueness check is the guard against cause 4 before the pipeline even starts: if the key you plan to join routed distances back on is not unique, no amount of order preservation downstream will save you.

Straight-Line Prescreen with a Spatial Join

Never route every leg. The straight-line distance is cheap and, for most sites, it is the answer — a candidate that sits 800 m from an unobstructed conductor does not need a network solve. Use sjoin_nearest (Shapely 2.x / GeoPandas ≥ 0.14) to attach the nearest grid feature and its planar distance to every site in one vectorized call, then flag only the legs that cross a known barrier layer for the async router. This is the same nearest-feature logic detailed in vectorized nearest-substation search with a KDTree; sjoin_nearest wraps it with the attribute join the screen needs.

The straight-line distance between a site and a grid vertex in the projected frame is the ordinary Euclidean metric,

which is only valid because both layers are in metres. This spatial work is CPU-bound and runs before the event loop opens — cause 3 is designed out by keeping it out of any async def.

python
import geopandas as gpd


def straight_line_prescreen(
    sites_gdf: gpd.GeoDataFrame,
    grid_gdf: gpd.GeoDataFrame,
    barriers_gdf: gpd.GeoDataFrame,
    obstruct_radius_m: float = 1_500.0,
) -> gpd.GeoDataFrame:
    """Attach nearest-grid distance, then flag legs crossing a barrier as obstructed."""
    nearest = gpd.sjoin_nearest(
        sites_gdf, grid_gdf[["available_capacity_mw", "geometry"]],
        how="left", distance_col="straight_line_m",
    ).reset_index(drop=True)

    # A leg is 'obstructed' if a barrier lies within the corridor to the grid.
    corridor = nearest.geometry.buffer(obstruct_radius_m)
    hit = gpd.GeoDataFrame(geometry=corridor, crs=nearest.crs).sjoin(
        barriers_gdf[["geometry"]], how="left", predicate="intersects"
    )
    nearest["obstructed"] = hit["index_right"].notna().to_numpy()
    return nearest

Everything with obstructed == False keeps its straight_line_m as the interconnection distance. Only the obstructed subset — typically a small fraction of the portfolio — is handed to the router, which is what makes the async stage affordable.

Async Proximity Scoring for Obstructed Legs

This is the corrected async client. It fixes causes 1, 2, and 4 together: an asyncio.Semaphore caps in-flight requests regardless of portfolio size, an aiohttp.ClientTimeout plus bounded exponential-backoff retry contains slow and transient-failure legs, and every result is returned keyed by site_id so the join back is by key, never by position. Failed legs degrade to inf (infeasible) rather than aborting the run.

python
import asyncio
import aiohttp
from typing import Dict


async def _route_one(
    site_id: str, x: float, y: float, endpoint: str,
    session: aiohttp.ClientSession, sem: asyncio.Semaphore,
    retries: int = 3,
) -> tuple[str, float]:
    payload = {"origin": [x, y], "mode": "grid_tie"}
    for attempt in range(retries):
        try:
            async with sem:  # bound concurrency: never more than N in flight
                async with session.post(endpoint, json=payload) as resp:
                    resp.raise_for_status()
                    data = await resp.json()
                    return site_id, float(data.get("distance_m", float("inf")))
        except (aiohttp.ClientError, asyncio.TimeoutError):
            if attempt == retries - 1:
                return site_id, float("inf")           # degrade, do not raise
            await asyncio.sleep(0.5 * 2 ** attempt)     # bounded backoff


async def resolve_obstructed_distances(
    obstructed: Dict[str, tuple[float, float]],
    endpoint: str,
    max_concurrency: int = 24,
    request_timeout_s: float = 10.0,
) -> Dict[str, float]:
    """Return {site_id: routed_distance_m}, order-independent and bounded."""
    sem = asyncio.Semaphore(max_concurrency)
    timeout = aiohttp.ClientTimeout(total=request_timeout_s)
    connector = aiohttp.TCPConnector(limit=max_concurrency)
    async with aiohttp.ClientSession(timeout=timeout, connector=connector) as session:
        tasks = [
            _route_one(sid, xy[0], xy[1], endpoint, session, sem)
            for sid, xy in obstructed.items()
        ]
        pairs = await asyncio.gather(*tasks)   # exceptions already handled inside
    return dict(pairs)

TCPConnector(limit=max_concurrency) and the Semaphore are deliberately set to the same ceiling: the connector caps the socket pool and the semaphore caps scheduled work, so neither the endpoint nor the file-descriptor table is ever swamped. Returning a dict keyed on site_id — rather than a positional list — is what structurally prevents the scrambled-ordering failure.

Merging Capacity Headroom and Ranking the Queue

A distance alone does not rank an interconnection queue; a site 3 km from a saturated feeder is worse than one 6 km from a feeder with spare thermal capacity. Merge the routed and straight-line distances into a single interconnection_m column, join the thermal headroom for interconnection screening already attached from the nearest asset, and compute a weighted feasibility score

Turning four normalised components into one ranking score A worked scoring example for a single interconnection queue application. Four rows give the component, its raw value, the normalised score and the weight: routed distance 11.4 kilometres normalises to 0.72 at weight 0.40; available headroom 24 megawatts normalises to 0.55 at weight 0.30; voltage-class fit is an exact match scoring 1.00 at weight 0.20; land control is an option rather than a lease, scoring 0.40 at weight 0.10. The weighted contributions are 0.288, 0.165, 0.200 and 0.040, summing to a composite score of 0.693. One application, four components, one comparable number component raw value normalised weight contribution routed distance 11.4 km 0.72 0.40 0.288 available headroom 24 MW 0.55 0.30 0.165 voltage-class fit exact match 1.00 0.20 0.200 land control option, not lease 0.40 0.10 0.040 composite 0.693 Distance carries the heaviest weight because it is the component that converts directly into capital cost; the weights are configuration, and every published ranking should record the set that produced it.

where is the interconnection distance, the available headroom in MW, and . The rank is stable and every input row survives — no filter drops a site without recording why.

python
import numpy as np
import pandas as pd


def rank_queue(
    prescreened: pd.DataFrame,
    routed: dict[str, float],
    w_dist: float = 0.6,
    w_head: float = 0.4,
) -> pd.DataFrame:
    df = prescreened.copy()
    # Obstructed legs take the routed distance; clear legs keep straight-line.
    routed_series = df["site_id"].map(routed)          # join BY KEY, not position
    df["interconnection_m"] = np.where(
        df["obstructed"], routed_series, df["straight_line_m"]
    )
    d_max = df["interconnection_m"].replace(np.inf, np.nan).max()
    h_max = df["available_capacity_mw"].max()
    dist_term = 1.0 - (df["interconnection_m"] / d_max)
    head_term = df["available_capacity_mw"] / h_max
    df["feasibility_score"] = (
        w_dist * dist_term.clip(lower=0) + w_head * head_term.clip(lower=0)
    ).where(np.isfinite(df["interconnection_m"]), 0.0)

    df = df.sort_values("feasibility_score", ascending=False, kind="stable")
    df["queue_rank"] = np.arange(1, len(df) + 1)
    df["audit_timestamp"] = pd.Timestamp.utcnow().isoformat()
    return df

Export the result as GeoParquet or CSV; the audit_timestamp, the weights, and the retained obstructed flag are the lineage that lets a reviewer reproduce the ranking exactly.

Fallback Routing and Performance Tuning

  • Tune max_concurrency to the endpoint, not the portfolio. The right ceiling is the routing service’s published rate limit, typically 16–32. Raising it to chase throughput on a strict endpoint just trades socket exhaustion for 429s.
  • Cache identical origins. Parcels that share a centroid or snap to the same grid node produce identical routing payloads; memoize on the rounded (x, y) so duplicate legs cost one call, not many.
  • Offload any unavoidable in-loop CPU work. If a leg needs an on-the-fly cost-surface solve, wrap it in loop.run_in_executor(None, solve_fn) so the GEOS/NumPy call never blocks the event loop mid-batch.
  • Prescreen aggressively. Widen the barrier test only where terrain genuinely obstructs; every leg you keep as straight-line is one the router never has to serve.
  • Snapshot partial results. Persist the routed dict to disk as it fills so a mid-run endpoint outage resumes from the last completed leg instead of re-routing the whole obstructed subset.
Concurrency helps until the far end starts refusing A line chart of wall-clock minutes against concurrency for 3,400 routing calls. Sequential execution takes 41 minutes. Eight concurrent requests take 6.1 minutes, sixteen take 3.4, thirty-two take 2.4, sixty-four take 2.6 and one hundred and twenty eight take 3.6 as rate limiting sets in. The minimum at thirty-two is marked as the knee, and a shaded region beyond sixty-four is labelled as the range where retries dominate. 3 400 obstructed legs, routed against a rate-limited service retries dominate 0 min 10 min 20 min 30 min 40 min 1 8 16 32 64 128 concurrent requests (log scale) 41 min sequential knee — 2.4 min Set the semaphore at the knee, not at the maximum the event loop can open Past it, throughput falls while the service is being hammered — the worst of both

Downstream Integrity Assertion

Gate the ranked table in CI/CD before it reaches a development committee. The assertion catches the two silent regressions this pipeline is built to prevent — a scrambled or dropped join, and a distance that leaked through as NaN — plus rank monotonicity.

python
import numpy as np
import pandas as pd


def assert_queue_integrity(ranked: pd.DataFrame, n_input_sites: int) -> None:
    """CI/CD gate: fail the build if the screen is not decision-grade."""
    assert len(ranked) == n_input_sites, "row count changed — a site was dropped or duplicated"
    assert ranked["site_id"].is_unique, "duplicate site_id — join scrambled the portfolio"
    feasible = ranked.loc[ranked["feasibility_score"] > 0, "interconnection_m"]
    assert not feasible.isna().any(), "NaN interconnection distance on a feasible row"
    assert ranked["feasibility_score"].between(0.0, 1.0).all(), "score out of [0, 1] bounds"
    ranks = ranked["queue_rank"].to_numpy()
    assert np.array_equal(ranks, np.arange(1, len(ranked) + 1)), "queue_rank is not contiguous"
    assert ranked["feasibility_score"].is_monotonic_decreasing, "rank not aligned to score"

Asserting len(ranked) == n_input_sites is the single most valuable line: it fails loudly the instant an sjoin fan-out or a mis-keyed merge changes the portfolio size, catching the ordering failure that would otherwise ship a plausible-looking but wrong queue ranking.